Editing Automated Actions
Jump to navigation
Jump to search
Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 14: | Line 14: | ||
If the player does not have enough resources for the action scheduled, then the action will still take place to the best of its ability. Note that 'resources' here refers to anything used in the action, and doesn't necessarily refer to the traditional (e.g. platinum, ore, lumber, gems) resources alone. For example: A player wishes to train 1000 units and has scheduled an action for that, but their [[Draftees]] were [[Espionage#Black-Ops|Assassinated]], leaving them with only 800 draftees. In this event, 800 draftees would be trained into whatever unit the player had selected, and the action is spent. Similarly, if a player wants to build 20 Smithies, but only has 14 empty Plains by the time the action is supposed to take place, then the action will execute, building 14 Smithies. | If the player does not have enough resources for the action scheduled, then the action will still take place to the best of its ability. Note that 'resources' here refers to anything used in the action, and doesn't necessarily refer to the traditional (e.g. platinum, ore, lumber, gems) resources alone. For example: A player wishes to train 1000 units and has scheduled an action for that, but their [[Draftees]] were [[Espionage#Black-Ops|Assassinated]], leaving them with only 800 draftees. In this event, 800 draftees would be trained into whatever unit the player had selected, and the action is spent. Similarly, if a player wants to build 20 Smithies, but only has 14 empty Plains by the time the action is supposed to take place, then the action will execute, building 14 Smithies. | ||
− | |||
− | |||
===Scheduling=== | ===Scheduling=== |